The finalisation of the Design Guide follows around 18 months of engagement and development, bringing together feedback from stakeholders and design considerations for both projects.
Prior to the submission of each project’s Development Consent Order (DCO) application, both North Falls and Five Estuaries prepared ‘design approach documents’ to outline individual plans and to evidence the ‘good design’ followed, in accordance with the overarching national planning policy for energy.
This Design Guide brings together the two projects’ individual approaches and plans into one combined document that will be issued to the commissioned substation designers to provide a framework that informs the tender and detailed design processes by providing a clear indication of design requirements for the two projects. Focusing on areas where collaboration can help minimise the impact of the substations and explore areas for improvement, such as enhancing biodiversity for the environment and surrounding communities.
View the final Design Guide by clicking the button below. You can also read our news article here, which summarises our engagement approach and how feedback from communities and stakeholders has informed the final document.
The purpose of the Design Guide and our engagement with surrounding communities is to:
The Design Guide is an iterative document, which was subject to review by key stakeholders, interested parties and an independent design review panel.
The content evolved as stakeholder feedback was gathered, and the shortlist of acceptable options was refined.
Click on the button below to read a summary of our engagement approach and how feedback from communities and stakeholders has informed the final document.
A working group focusing on the design process between the projects and councils was established early in the Design Guide process, with a clear goal to ensure transparency and oversight.
The group met on a regular basis to share updates and insight as the Design Guide developed.
An output of this working group was the inclusion of the Essex Quality Review Panel (EQPR) in the process. Established by the Essex Planning Officers Association, in partnership with Place Services, the EQRP ensures delivery and promotion of high-quality new developments within Essex through the creation of good design, sustainability, and improved quality, creating better places and environments to work and live in the county.
The councils were also briefed on the process and outcomes of the Design Review Panel. This was an internal North Falls and Five Estuaries panel where members were appointed from elsewhere within the shareholders’ organisations to provide technical guidance and experience throughout the Design Guide process, ensuring that design quality is maintained throughout the whole process and during construction.
North Falls and Five Estuaries understand the benefits of coordinating with nearby projects (National Grid’s Norwich to Tilbury and the Tarchon Interconnector Project) and aim to do so wherever possible. To this end, we are in regular dialogue with both projects and we have signed a ‘Cooperation Agreement’ with National Grid regarding interactions and activities around the proposed substation sites.
In some areas, however, coordination at this time is naturally limited. This is because all the projects are on different timelines and at different stages of the Nationally Significant Infrastructure Project (NSIP) consenting process. North Falls and Five Estuaries are more advanced and have already received their Development Consent Orders. As a result, we were in a position to carry out engagement on the Joint Substations Design Guide (Design Guide) ahead of engaging with substation designers and contractors.
We have committed to co-locate our respective substations and we will share the same onshore cable corridor. Our timelines are currently also similar. All of which means we were able to closely coordinate and carry out this engagement together.
Norwich to Tilbury’s onshore substation (the East Anglia Connection Node, or ‘EACN’) is the connection point for our projects, but it is proposed to be situated adjacent to, rather than co-located with, our proposed substations.
National Grid were a key stakeholder throughout the Design Guide engagement process and we will ensure that any proposals brought forward consider Norwich to Tilbury and the Tarchon Project. Alongside Essex County Council and Tendring District Council, we will pass on shared experience and knowledge to these nearby projects, helping to ensure that their design processes complement our own and develop in the best interests of local communities.
Keep in touch
| Phone: | 0333 880 5306 |
|---|---|
| Email: | info@fiveestuaries.co.uk |
| Write to us: |
Five Estuaries Offshore Wind Farm Ltd, Alexander House, 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland DH4 5RA |
© 2020 Five estuaries offshore wind farm
Registered in England & Wales 12292474
VAT number 347 5985 47